Design and engineering
Feasibility, acoustic simulation, plans and specifications, technical drawings
Preliminary studies
Feasibility study and preliminary project plan
Assessment of technical, operational and regulatory viability. Analysis of site constraints, risk assessment and redundancy levels. Roadmap with technology choices, milestones and budget estimates.
StudyReport
Needs analysis and system definition
Identification and formalization of emergency communication needs: intervention scenarios, areas to be covered, levels of redundancy, interfaces with existing systems and operating requirements.
StudyReport
Acoustic simulation and modeling
Preliminary acoustic calculation
Statistical calculation of acoustic parameters of a space (reverberation time, estimated levels) for rapid validation of feasibility in the preliminary phase.
Tool: AFMG Reflex
CalculationReport
Acoustic characterization of building materials
Model absorption and insulation properties of materials. Creation of customized profiles from manufacturers' data or field surveys, for integration into simulation models.
Tool: AFMG SoundFlow
CalculationReport
Acoustic coverage study (SPL modeling and intelligibility)
Simulation of sound level distribution and intelligibility. Optimization of device positioning and power. Verification that each space is acoustically distinguishable.
Tools: EASE 5, Aura, Acousteer, AFMG Reflex
CalculationReport
Visual coverage study (illuminated signs)
Simulation of visual notification device coverage. Verification of visibility in all occupied areas at required light intensity levels.
CalculationReport
3D geometric modeling of the building
Construction of a three-dimensional geometric model for acoustic simulation. Integration of point clouds (Lidar, drone) or existing architectural plans.
CalculationReport
Plans, specifications and technical drawings
Production of detailed technical drawings and specifications
Preparation of detailed design documents as a basis for tendering and execution of work. Includes all technical drawings listed below.
Report
Detailed configuration and commissioning quotations
Step-by-step procedures for hardware and software configuration, gain parameters, zone assignment, priority logic, network configuration and verification procedures at each stage. Precisely written to ensure unambiguous design intent.
Report
Review of shop drawings and contractor bids
Analysis and comments on shop drawings, data sheets and quotations submitted by the contractor prior to installation. Verification of compliance with approved plans and specifications.
InspectionReport
Design drawings
Equipment layout plan
Location of all devices on architectural plan: loudspeakers, visual notification devices, call consoles, cabinets and cable trays.
Drawing
Sound coverage map (SPL mapping)
Simulation sound level distribution plan. Overlay of results on the architectural plan by zone.
CalculationDrawing
Intelligibility map (STI mapping)
Distribution of STI values by zone. Identification of acoustically distinguishable spaces and areas requiring correction.
CalculationDrawing
Riser diagram
Vertical representation of the system: circuits, zones, interconnections between levels and connection points.
Drawing
System architecture diagram (block diagram)
Functional representation of components and their interrelationships: sources, processing, amplification, distribution and field devices.
Drawing
Audio signal flow diagram
Complete signal path from sources to loudspeakers, with gain levels, processing and monitoring points at each stage.
Drawing
Field wiring diagram
Connection details: cable types, numbering, terminals and circuit characteristics.
Drawing
System interconnection diagram
Interfaces between the emergency communication system and third-party systems: fire alarm, BAS/BMS, access control, telecommunications.
Drawing
Power distribution diagram
Power architecture: primary sources, emergency power, distribution circuits and protection.
Drawing
Rack elevation and cabinet layout plan
Physical layout of equipment in cabinets and racks: position of modules, cable management, power supply and ventilation.
Drawing
Operating sequence and zoning matrix
Operation logic: tripping by zone, priorities, evacuation modes, responses to faults and interactions with interfaced systems.
Drawing
System interface matrix
Reference table of all interfaces: signal, protocol, trigger conditions, priority and expected behavior.
Drawing
System software configuration diagram
Logical architecture of an IP system (e.g. Bosch Praesensa, Q-SYS): zones, channels, priorities, operating logic, network and supervision.
Drawing
IP network topology and addressing scheme
Audio system network infrastructure: active equipment, addressing, VLANs, PoE power supply and redundancy.
Drawing
Battery capacity calculation
Sizing of battery packs according to total load, required autonomy duration, ageing factor and operating conditions.
CalculationReport
Calculating circuit voltage drops
Line losses and voltage drops on supply and notification circuits (25 V, 70 V, 100 V). Verification of conductor sizing.
CalculationReport
Equipment schedule
Complete list: manufacturer, model, listing number (UL/ULC), technical specifications and quantities.
Drawing
Narrative description of the system
Text document describing overall operation, operating scenarios, degraded modes and operating responsibilities.
Report
Formal test matrix
Structured table of required tests: zones, functions, trigger conditions, expected results and acceptance criteria. Serves as a basis for FAT, SAT, UAT and integrated test protocols.
Drawing
As-built drawings
Updating design plans to as-built drawings
Revision of all design drawings to reflect the actual state of the installation after completion and commissioning.
Drawing
Survey of existing building to produce as-built drawings
On-site physical survey of an existing system without up-to-date drawings. Production of new drawings in line with the actual state of the installation.
InspectionDrawing
02
Consultation and expertise
Strategic analysis, compliance, investigation, standards expertise and safety planning
Analysis and recommendations
Strategic analysis and recommendations
In-depth assessment of site needs: operational objectives, intervention scenarios, technical constraints, safety issues and investment horizons. Tailor-made, results-oriented recommendations.
StudyReport
Condition survey of existing system
State of obsolescence, parts availability, risk of failure, replacement or upgrade options, feasibility and pre-project plan.
StudyReport
System compliance analysis
Compliance of an existing system with applicable requirements. Identification of gaps, non-conformities and recommendations for upgrades.
StudyReport
Retroactivity analysis
Identify retroactivity vectors triggered by a modification or change of vocation. Assess the impact on the existing system and the resulting obligations.
StudyReport
Independent design review (peer review)
Critical review of plans and specifications produced by another firm, on behalf of the owner or client. Verification of compliance, completeness and consistency of design approach.
StudyReport
Technical evaluation of contractor bids
Analysis of bids received in response to a call for tenders: technical compliance, comparison of approaches, identification of shortcomings and recommendation for award.
StudyReport
Verification of technical documentation
Completeness and accuracy of existing documentation: plans, procedures, test reports, compliance files. Identification of gaps.
StudyReport
Investigation and failure analysis
Failure analysis and root cause analysis (RCA)
Structured investigation following system failure or event non-performance. Identification of root cause, contributing factors and latent failures. Root cause report with corrective and preventive recommendations.
StudyReport
Standards expertise and safety planning
Normative interpretation and regulatory consultation
Answers questions on interpretation of codes and standards. Preparation of applications for exemption or equivalence with the competent authority (AHJ). Support during regulatory inspections.
StudyReport
Standards watch and impact analysis
Monitor changes in applicable standards and codes. Analyze the impact of new editions on a customer's existing systems and identify any action required.
StudyReport
Participation in emergency measures plan (EMP) review committees
Contribution as an expert in emergency communication systems to PMU review and validation committees. Expert role in interdisciplinary functional groups: validation of consistency between communication systems, intervention scenarios and operational procedures.
StudyManagementReport
Risk analysis of emergency communication systems
Participation in risk analysis exercises: identification of failure scenarios, assessment of consequences, mitigation recommendations. Technical expert role in functional risk management groups.
StudyReport
Contribution to business continuity planning (BCP)
Participation in the development or revision of BCPs for emergency communication systems: identification of critical systems, definition of acceptable degraded modes, recovery procedures and redundancy requirements.
StudyReport
03
Monitoring and testing
Site supervision, acceptance testing, commissioning, integrated testing
Site supervision
Site supervision and installation quality control
Progressive monitoring of work: verification that the installation complies with plans, specifications and applicable requirements. Inspection of equipment, connections, emergency power supplies and redundancies.
InspectionReport
Acceptance and commissioning tests
Factory acceptance test (FAT)
Participate in and draw up the test protocol for the manufacturer or integrator before shipment. Check functions, configuration, alarms and performance under workshop conditions.
InspectionMeasuresCertif.Report
Pre-operational check (VPO)
On-site verification prior to commissioning: integrity of circuits, sound paths, power supplies, redundancies and supervision. Confirmation that the system is ready for acceptance testing.
InspectionMeasuresReport
On-site acceptance test (SAT)
Complete functional testing by zone: priority logic, evacuation modes, control interfaces, tripping, sound coverage and intelligibility.
InspectionMeasuresCertif.Report
User acceptance test (UAT)
Support the customer during final validation tests. Verification that the system meets the operational needs defined in the initial requirements.
InspectionMeasuresCertif.Report
Endurance test
Stability testing and sustained performance over an extended period. Continuous load monitoring, degradation detection and validation of operational reliability.
MeasuresCertif.Report
Multi-system integrated testing (participation and support)
Participation and technical support for coordinated tests involving several interacting systems (e.g., according to NFPA 3, NFPA 4 or ULC-S1001): emergency PA, fire alarm, BAS/BMS, access control. Validation of interfaces, sequences and priorities between systems.
InspectionMeasuresCertif.Report
Commissioning tests
Comprehensive testing program for new system commissioning or major upgrade. Issuance of a commissioning certificate on successful completion of testing.
MeasuresCertif.Report
Acoustic field measurements
Sound pressure level (SPL) measurement
Indoor and outdoor sound level measurements. Verification that each space is acoustically distinguishable.
Tools: NTi XL2, MR-Pro
MeasuresReport
Speech intelligibility measurement (STI)
Assessment of speech intelligibility. Confirmation that each acoustically distinguishable space meets the required thresholds.
Tools: NTi XL2, MR-Pro, TalkBox, EASERA
MeasuresReport
Detailed electroacoustic analysis (impulse response, frequency response)
Measurement and analysis of impulse response, frequency response and electroacoustic parameters of circuits and devices. In-depth characterization of system acoustic behavior.
Tools: EASERA, SysTune
MeasuresReport
Real-time system alignment and optimization
Measure, adjust and optimize the audio system under real-life conditions during commissioning or calibration: time alignment, equalization, adjustment of levels by zone.
Tools: SysTune, NTi XL2
MeasuresReport
Ambient noise survey
Measurement and characterization of background noise: LAeq, LDay, LNight, percentile levels (L1, L5, L90). Analysis of acoustic shadow zones and corrective proposals.
MeasuresReport
Real-time spectral analysis (RTA)
Frequency content analysis by octave band or third octave. Characterization of system response and identification of resonances.
Tools: NTi XL2, SysTune, EASERA
MeasuresReport
Functional check of sound system
Full operational test: general call, selective call by zone, message priority, transfer to emergency power supply.
MeasuresReport
Visual inspection of equipment
Visual inspection of public address and notification equipment
Physical condition of loudspeakers and visual notification devices according to CSX Group's Structured Inspection Protocol (SIP).
InspectionReport
Visual inspection of control and feed equipment
Control cabinets, power panels and CPUs according to CSX Group's structured inspection protocol (PIE).
InspectionReport
Thermography of equipment and power supply cabinets
Infrared scanning to detect abnormal heat points: incorrectly tightened terminals, overloads, faulty connections.
InspectionMeasuresReport
Interior brightness reading
Measurement of ambient light level (lux). Used to check visual notification systems.
MeasuresReport
Electrical and wiring tests
Impedance measurement of loudspeaker circuits (25 V, 70 V and 100 V)
Line impedance on constant voltage distribution circuits. Detection of overloads, partial shorts and load imbalances.
MeasuresReport
Field wiring tests (continuity, insulation, grounding, inductance)
Continuity, insulation resistance, ground connections and inductive characteristics of circuits.
MeasuresReport
Measurement of grounding resistance
Measure without interrupting the circuit using an earth clamp (REED R5710).
MeasuresReport
Checking power supply circuits (voltage and voltage drop)
Nominal voltages, voltage drops and power consumption of supply circuits.
MeasuresReport
Battery testing (internal resistance and discharge test under nominal load)
Internal resistance and voltage during a discharge test under nominal load. Assessment of effective capacity and health of battery packs.
MeasuresReport
Ambient conditions
Survey of ambient conditions
Temperature, relative humidity, atmospheric pressure, particles, mechanical vibrations and electromagnetic fields (EMC / EMI / EMF). To determine enclosure type, anchoring requirements and equipment compatibility.
MeasuresReport
04
Project management and coordination
Planning, documentation, interdisciplinary coordination
Planning and follow-up
Schedule, resource and budget management
Milestone planning, progress monitoring, resource management and continuous budget control.
ManagementReport
Follow-up of documentation, deliverables and modifications
Validation, updating and archiving of technical deliverables. Change management and structured change communication.
ManagementReport
Interdisciplinary and inter-batch coordination
Coordination between disciplines: architecture, electrical, mechanical, safety, network, telecommunications and acoustics. Consistency between project phases.
ManagementReport
05
Documentation and knowledge transfer
Reports, manuals, test procedures, training
Documentary deliverables
Inspection and test procedure and report (PIE / RIE)
Inspection and test procedure (PIE) and report (RIE) according to CSX Group protocol, including results, observations and conclusions.
ReportCertif.
Field observation report
Structured report produced following a site visit: anomalies, deficiencies, observations and recommendations.
Report
Drafting customized test procedures
Procedures tailored to customer, site or system requirements. Includes FAT, SAT, UAT, VPO and integrated testing protocols.
Report
Complete system manual
Complete technical manual: system description, operating, maintenance and verification procedures, and applicable compliance requirements.
Report
Preventive maintenance program
Periodic tasks, frequencies, required resources, tooling and acceptance criteria. Deliverable given to customer for internal or contractual acceptance.
Report
Training
Comprehensive training on public address and emergency communication systems
Program adapted to the level of participants (users, technicians, managers): operating principles, components, interfaces and operating procedures.
Training
System testing and compliance training
For engineers, project managers and compliance officers: inspection methods, test procedures and applicable requirements.
Training
Knowledge transfer and customized training
Program adapted to a specific context. May include teaching materials, procedures and reference guides.
TrainingReport
06
Periodic inspection and testing
Annual and semi-annual cycles, certification, network and structured cabling
Periodic system testing
Periodic system testing - annual cycle (12 months)
Comprehensive annual testing program: power, cabling, field devices, control functions, sound level and intelligibility. Annual certificate of compliance.
MeasuresCertif.Report
Periodic system testing - 6-month cycle
Intermediate tests covering critical system elements. Semi-annual verification certificate issued.
MeasuresCertif.Report
Network and cabling infrastructure
Certification of structured copper cabling - Tier 1 / Tier 2
Permanent links and copper channels (Cat 5e, Cat 6, Cat 6A, Cat 8). Issuance of a recognized certification report.
MeasuresCertif.Report
Certification of SM and MM fiber optic cabling - Tier 1 / Tier 2
Single-mode (SM) and multi-mode (MM) fiber links: Tier 1 (insertion loss) and Tier 2 (OTDR reflectometry). Issuance of a recognized certification report.
MeasuresCertif.Report
Ethernet network diagnostics and troubleshooting
Connectivity, bandwidth, latency, packet loss. Checking switches, VLANs and PoE power.
MeasuresReport
Wireless network (WiFi) survey and analysis
WiFi coverage, signal levels, interference and channels. Detection of unauthorized access points.
MeasuresReport
Network posture inventory and analysis (NetAlly CyberScope)
Discover connected devices, active services, open ports, network topology and detect known vulnerabilities.
MeasuresReport
Intervention type legend
Measures Instrumented test / calculation
Inspection Visual inspection/monitoring
Certif. Certificate issue
Audit Study / audit / analysis
Management Project management
Training Training / transfer
Report Report / technical drawing